Home builder in Westbury, NY
Remodeling in Westbury, New Cassel and Salisbury
In the Village of Westbury, New Cassel and Salisbury, ZDE Enterprises does demolition, knockdown and rebuild, excavation and site work, retaining walls, concrete and interior remodeling. The phone is answered by Jason, the owner, and the estimate is his.

Why Westbury homeowners call ZDE
The owner answers
You talk to Jason, not a call center.
One builder
Tear-out to finish, no handoffs.
Written contract
Every job, before work starts.
Free estimates
Know the scope before you commit.

Home rebuilds and renovations in Westbury
Settled in 1658, built out by the 1950s
Westbury’s first settlers arrived in 1658, on the Hempstead Plains. New Cassel, founded in the mid-1700s by formerly enslaved farmers, was one of the first free African American communities on Long Island, and it stayed an unincorporated hamlet when Westbury became a village in 1932. By the mid-1950s Westbury had all but run out of open land, and the building boom ended. Salisbury, once known as South Westbury, has many Levitt-style homes beside Eisenhower Park.
Census figures put the median year built at 1955, with roughly seven in ten homes from before 1960. Owners of houses that age compare a deep renovation with a knockdown and a new build on the same footprint.
How a project works in Westbury
Village, Town of North Hempstead or Town of Hempstead
The Village of Westbury, mostly in the southeastern part of the Town of North Hempstead, runs its own Buildings Department and says no work may begin before a permit is obtained. New Cassel is a hamlet governed directly by the Town of North Hempstead, so its permits go through the Town’s Buildings Department and MyToNH. Salisbury belongs to the Town of Hempstead, whose Building Department works through its Online Permit Center. Three places, three offices: the address settles which one.
- 1
Look and estimate
Jason looks at the job and tells you what is known and what isn't. The estimate is free.
- 2
Paperwork first
The permit comes from the Village of Westbury Buildings Department or another office, by address. Its requirements are lined up before work starts.
- 3
Work and clean-up
Our own machines do the work, and the site is left clean for what comes next.
Free Home Remodeling Estimates in Westbury
Ready to start in Westbury?

Owner-run building and demolition for Westbury homeowners
One person from first call to contract
ZDE Enterprises is owner-run, so the person answering your call is Jason, and the estimate he puts together is free.
We operate our own equipment, an excavator among it. Every job gets a written contract, and all of our work is in Nassau County.

Westbury permit paperwork, village and Town
Paperwork by jurisdiction
The Village of Westbury lists demolition and retaining walls among the work that needs a building permit. Its application is notarized and comes with two sets of scaled drawings carrying the original seal of a licensed engineer or registered architect, two copies of the survey and the contractor’s insurance certificate naming the village. Plumbing and electrical work goes to professionals the village licenses.
For a Salisbury teardown, the Town of Hempstead’s October 2025 instructions start with a plumbing permit to cut off sewer and water, then want a survey with a plot plan, utility letters from PSEG and National Grid, an 811 ticket, an asbestos affidavit from a licensed inspector and a County extermination certificate, plus affidavits on voids and tree preservation.
Home Remodeling and Construction Services in Westbury
Every service, one builder
Every trade from one owner-run builder, anywhere in Nassau County.

Kitchen Remodeling
Cabinets, countertops and layouts built around the way you use the kitchen.

Bathroom Remodeling
Vanities, tubs, showers and tile, planned as one bathroom remodel.

Basement Remodeling
Plan the preparation, framing and finishes for a more useful lower level.

Interior Remodeling
Kitchens, baths and basements, start to finish.

Knockdown & Rebuild
Take the old house down and build the new one with one builder.

Hardscaping
Full patios, driveways and walkways, from preparation to installation.

Retaining Walls
Built to hold, engineered and permitted when required.

Concrete
Driveways, patios, walkways, steps and slabs.

Excavation & Foundations
Excavation, foundations, grading and drainage with our own machines.

Demolition
Whole houses, garages, pools and interiors, hauled away.

Commercial
Demolition and site work for commercial properties.
Westbury Home Building and Remodeling Questions
Questions, answered
Common questions about building in Westbury.
Not answered here?
Call and ask. You talk to the owner: 516-506-3928.
Who issues demolition permits in Westbury?
For an address in the village, the Village of Westbury Buildings Department, which lists demolition among the work it permits. New Cassel files with the Town of North Hempstead Buildings Department, and Salisbury with the Town of Hempstead Building Department. Village Buildings Department
What goes with a Village of Westbury permit application?
The village page lists a notarized application, two sets of drawings to scale with an engineer’s or architect’s original seal and signature, two copies of the survey, and an insurance certificate from the contractor naming the village as holder. Village permit requirements
Who can do plumbing and electrical work in the village?
The Village of Westbury says all plumbing and electrical work is to be performed by a professional licensed by the village itself. That is worth knowing early when a remodel moves fixtures or adds circuits. Westbury Buildings Department
What does the Town ask for before a demolition in Salisbury?
Salisbury is a Town of Hempstead hamlet, so the Town’s demolition instructions apply. They put the sewer and water disconnect permit first, then call for utility letters, the 811 ticket, asbestos and extermination paperwork, a survey and plot plan, and voids and tree affidavits. Town demolition instructions (PDF)
Does Westbury's village code cover flood areas?
It has a Flood Damage Prevention chapter, Chapter 127. Its definitions count work costing 50% or more of a building’s market value before construction as a substantial improvement. The definitions themselves don’t say which lots, if any, sit in a mapped flood area. Westbury Chapter 127
What does the village need before a certificate of occupancy?
A final updated survey, a final electrical certificate and a final inspection by the Buildings Department. A certificate of completion goes through the same three steps. Village Buildings Department

