Home builder in Floral Park, NY
Home remodeling across the Floral Park villages
ZDE does kitchen, bathroom, basement and interior remodeling in Floral Park, South Floral Park, Bellerose and Bellerose Terrace, plus knockdown and rebuild, demolition, excavation, retaining walls and concrete. It is an owner-run outfit, so when you call, Jason answers, and he is the one who carries your job through.

Why Floral Park homeowners call ZDE
The owner answers
You talk to Jason, not a call center.
One builder
Tear-out to finish, no handoffs.
Written contract
Every job, before work starts.
Free estimates
Know the scope before you commit.

Home rebuilds and renovations in Floral Park
Seed farms first, then houses
Floral Park’s story starts in 1874, when John Lewis Childs, then 17, came to the area known as East Hinsdale to work for the flower and seed grower C. L. Allen; the village incorporated on October 15, 1908. In 1907 Helen Marsh bought 77 acres of Floral Park gladiola fields to build the model community of Bellerose, whose first home was finished in 1910, and South Floral Park was first developed around 1905.
Census figures put the median year built at 1940, with 84 percent of homes built before 1960. Many of these houses have stood for eighty years or more, so owners weigh new systems inside the old shell against replacing the house outright.
How a project works in Floral Park
Four places, four permit desks
Floral Park, South Floral Park and Bellerose are separate incorporated villages in the Town of Hempstead, and each has its own building department or building inspector; a slice of Floral Park north of Jericho Turnpike lies in the Town of North Hempstead. Bellerose Terrace is an unincorporated hamlet, so its permits go through the Town of Hempstead Department of Buildings. Match the street address to the right desk before anything else.
- 1
Look and estimate
Jason looks at the job and tells you what is known and what isn't. The estimate is free.
- 2
Paperwork first
The permit comes from the Village of Floral Park Department of Buildings or another office, by address. Its requirements are lined up before work starts.
- 3
Work and clean-up
Our own machines do the work, and the site is left clean for what comes next.
Free Home Remodeling Estimates in Floral Park
Ready to start in Floral Park?

Owner-run demolition and building for Floral Park homes
The owner answers
At ZDE Enterprises the owner, Jason, is also the person on the phone. He comes out to look at the work and prices it himself, and the estimate is free.
We operate our own machines, an excavator among them, write up every job as a contract, and work in Nassau County and nowhere else.

Floral Park demolition guidelines and village review boards
What Floral Park's guidelines ask for
Floral Park’s demolition guidelines call for a signed, notarized building permit application, a recent survey marking the building that is coming down, and an asbestos survey or removal certification from a NYS Certified Asbestos Inspector. Disconnect letters come from the sewer, water, gas and electric providers, and the Nassau County rodent-free certificate is good for ten days, with the demolition to be finished inside that window. The permit conditions add a building inspection before work starts, an 811 call at least 48 hours before digging, a perimeter construction fence and dust and erosion controls.
Review boards differ from village to village. Floral Park’s Architectural & Preliminary Site Plan Review Board meets monthly, and some projects need its approval before a permit issues. In Bellerose, the Building Inspector may send exterior work or a demolition to the village’s Architectural Review Committee.
Home Remodeling and Construction Services in Floral Park
Every service, one builder
Every trade from one owner-run builder, anywhere in Nassau County.

Kitchen Remodeling
Cabinets, countertops and layouts built around the way you use the kitchen.

Bathroom Remodeling
Vanities, tubs, showers and tile, planned as one bathroom remodel.

Basement Remodeling
Plan the preparation, framing and finishes for a more useful lower level.

Interior Remodeling
Kitchens, baths and basements, start to finish.

Knockdown & Rebuild
Take the old house down and build the new one with one builder.

Hardscaping
Full patios, driveways and walkways, from preparation to installation.

Retaining Walls
Built to hold, engineered and permitted when required.

Concrete
Driveways, patios, walkways, steps and slabs.

Excavation & Foundations
Excavation, foundations, grading and drainage with our own machines.

Demolition
Whole houses, garages, pools and interiors, hauled away.

Commercial
Demolition and site work for commercial properties.
Floral Park Home Building and Remodeling Questions
Questions, answered
Common questions about building in Floral Park.
Not answered here?
Call and ask. You talk to the owner: 516-506-3928.
Who issues demolition permits in Floral Park?
Each village handles its own permits: the Floral Park Department of Buildings at 1 Pool and Garage Road, the South Floral Park Building Inspector, and the Bellerose Building Department at 50 Superior Road. Bellerose Terrace, a hamlet, files with the Town of Hempstead Department of Buildings. Floral Park Building Department
What do Floral Park's demolition guidelines ask for?
A notarized permit application, a recent survey showing the building to be removed, asbestos clearance from a NYS Certified Asbestos Inspector, utility disconnect letters and a Nassau County rodent-free certificate, then a building inspection before the work begins. Demolition permit guidelines (PDF)
Does a demolition in Bellerose need its own permit?
Yes. Village Code 68-30 calls for a permit to demolish a building. The applicant shows the Building Inspector that the utilities were notified in writing to disconnect and seal their lines, and work waits until they are certified disconnected. Bellerose building permits
Is there architectural review in Floral Park and Bellerose?
Both villages have it. Floral Park’s Architectural & Preliminary Site Plan Review Board meets monthly on Wednesdays with set submission deadlines. In Bellerose, the Building Inspector can refer exterior construction, remodeling or demolition to the Architectural Review Committee; like-for-like window, door and roof replacements are exempt. Floral Park review board
Which parts of the area flood?
The county hazard mitigation plan names the west end of Floral Park village as its most flood-prone area, and South Floral Park’s annex points to the low ground along Chelsea Street at the bottom of the hill. Floral Park also limits paving on front lawns to hold stormwater. Floral Park hazard mitigation annex (PDF)
Do you work in South Floral Park, Bellerose and Bellerose Terrace?
Yes. ZDE works across Nassau County, including all three villages and the Bellerose Terrace hamlet. Bellerose Terrace falls under the Town of Hempstead’s demolition instructions, which list survey, disconnect, asbestos, extermination and tree-preservation paperwork. Town demolition instructions (PDF)
Home Builder in Towns Near Floral Park
Nearby towns

